.::welcome to our website::.      


EPIC for Closing Slab at Level 17 & 19 of Torch Tower

Client: Aspire Zone
Location: Aspire Torch Tower, Doha
Duration: 2011-2012
The scope of this EPIC project is execution of civil , architectural & MEP works for closing slab level 17 of the Torch Tower hotel at Aspire Zone to provide Express lift access to VIP. This project includes execution of composite slab, wooden wall cladding, ceramic flooring and false ceiling as well as MEP works and tie in to existing BMS system.

Image Gallery